Advertising Disclosure
10 Best long lead plug in the UK
- Best Choice
1
NVEESHOXNVEESHOX Extension Lead Surge Protection,12 Way Power Strip Tower with 4 USB Slots 5M/16FT Long Extension Cord Multi Plug 3250W 13A Overload Protection for TV PC Laptops iPhones Tablets (Black-5M)
24% Off Free Shipping 2
hotimy5M Extension Lead with USB Slots, Hotimy 13A Cube Extension Lead with 2 USB A and 2 USB C Ports, 4 Way Plug Extension Socket with Switch Power Strip 5 Meters Long Extension Cord for Home Office
Free Shipping3
DesiretechDESIRETECH White Electric Extension Lead 4 Gang 2 Metre | 2m Long Cable | UK Plug 3 Pin Socket Outlet | Wall Mountable | Multi Socket Mains Strip For Home, Bedroom, Kitchen and Office (1 Pack)
Free Shipping4
LIPWELHeavy Duty Extension Lead Outdoor Extension Cord 5m Long Power Strip Black Cable Single Plug Socket 13 Amp For Garden
Free Shipping- Value for Money
5
EXTRASTARExtraStar 1 Way Gang Single Socket Mains Power Extension Lead 13A UK 3Pin Plug - 5 Metre Cable, White
Free Shipping 6
PARTHPARTH 5 Way Extension Lead Surge Protected UK Plug With 4M Long Cord Surge Protection Black Extension Cable Individually Switched Power Strip 5 Gang Socket Plug 3250W/13A
Free Shipping7
Abacus Range6 Way Multi Plug Extension Lead 5m Power Strip - 6 Socket Extension Cord 5 Meter - 6 Gang UK Mains Electric Power Long Extension Cable - White
Free Shipping8
Mscien5M Extension Lead, 5 Gang Extension Lead with Individually Switches, MSCIEN 5 Metre Extension Lead with Wall Mounted, Long Extension Lead 5M White, Multi Socket Plug Extension for Home Dorm Office
10% Off Free Shipping9
Spares2goSPARES2GO Universal 2 Core Extra Long Mains Cable Lead Plug for Corded Power Drill (8.4m)
Free Shipping10
LIPWELLIPWEL Extension Lead 5m Long Extension Cable 4 Way Power Strip Fireproof Power Socket Black Extension Cord 3250W Muti Plug for Home, Office&Garden
Free Shipping